This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

News
27 Sep 2019

Sai’s new production block now open for business!

API and Intermediate manufacturing facility

The brand-new API and Intermediate manufacturing facility (Block #8) at Sai Life Sciences is the company’s largest block in terms of volume and size. It marks a 70% increase in reactor volume taking the combined capacity past 400 KL.  The project was completed in an accelerated time-frame of 15 months and had the distinction of clocking 0.5 million manhours of project execution without a single lost time incident!

The brand-new API and Intermediate manufacturing facility (Block #8) at Sai Life Sciences is the company’s largest block in terms of volume and size. It marks a 70% increase in reactor volume taking the combined capacity past 400 KL.  The project was completed in an accelerated time-frame of 15 months and had the distinction of clocking 0.5 million manhours of project execution without a single lost time incident!

In addition to the increased volumetric capacity, Block #8 provides the flexibility to handle low and high volumes in a single block with 32 reactors (16 production trains) of sizes ranging from 1 KL to 10 KL. It has next generation automation, advanced containment systems, a separate storage area for staging of raw material and intermediates, an increased ratio of filter dryers to reactors ratio, a dedicated vacuum system for every two reactors, and a 5 KL cryo reactor.

Mentioned Companies
Sai Life Sciences
View company profile